Henan Provincial Energy Bureau recently released "2016 Henan Province Wind power Utilization hours", according to statistics, Xu Ji put into operation fan utilization hours ranked among the best. Among them, Datang Yuanbaoshan Wind Farm ranks the second, Datang Yanshan Wind Farm ranks the third, Datang New Energy Qingyuan Wind Farm ranks the fifth, Leizhen Mountain Wind Farm in Yanling Wind Farm of the State Power Investment Company ranks the first in the owner assessment and evaluation, and Henan alone ranks the first. This fully reflects the Xuji wind turbine generation efficiency, high reliability, good power quality, good grid adaptability, adapt to the specific wind field technical advantages.
National electric cast shan lei Chen mountain wind 21 2.0 MW wind turbines generator, equivalent available hours 2968 hours, 2016 hours can increase about 1% in 2015, in national electric jolt mountain (Xu Ji fan), ring pingshan (sinovel fan) and zigzagging mountain (fan) MingYang appraisal appraisal ranked first, single henan ranked first.
Datang Yuanbaoshan Wind Farm has 21 2.0MW wind turbine generating units, with an equivalent available hours of 2442 hours in 2016, ranking the first among the six wind farms in Datang and the second in Henan Province.
The equivalent available hours of Datang Yanshan Wind Farm in 2016 was 2,328 hours, ranking third in Henan Province.
Datang New Energy Qingyuan wind Farm in 2016 equivalent available hours 2145 hours, Henan Province ranked the fifth.